Workshop “Automatic System of Voltage and Reactive Power Control in power transmission system” – Czech Republic

Thứ sáu, 2/6/2017 | 13:30 GMT+7
​On 30th May 2017, National Power Transmission Corporation (EVNNPT) combined with Trade Promotion Department of Czech Republic in Ho Chi Minh city and Joint Stock EGÚ Praha Engineering, a.s. company (EGÚ) organized a workshop on “Automatic System of Voltage and Reactive Power Control in power transmission system” in EVNNPT headquarters. 

EGÚ Praha Engineering a.s Joint Stock Company is a technical company, specialized in providing solutions in power network and services aiming at energy save and increase​d efficiency of power use. EGÚ operates in 3 main aspects: Stabilization of power grid parameters; load distribution control and information technologies .

NPT-EGU_310517_1.jpg
Mr. Nguyen Minh Thang – Member of Management Board chaired the workshop

The workshop was chaired by Mr. Nguyen Minh Thang – Member of Management Board, participated   by representatives of Vietnam Electricity (EVN), Institute of Energy (IE), General Department of Energy (GDE), functional Departments of EVNNPT, Power Transmission Companies No. 1, 2, 3, 4 and Northern, Central and Southern Power Projects Management Board.

For the Trade Promotion Department include Mr. Zdenek Degen – Director ; EGU Joint Stock Company includes Mr. Jaromír Beran – Director and Mr. Petr Čech – Director of System Control and parameters Division.

NPT-EGU_310517_2.JPG
Representatives of Trade Promotion Department of Czech Republic and Joint Stock EGÚ a.s company

The workshop is to introduce experiences and capacity in development and application of methodologies and algorithms, SW system, HW and technical tools to stabilize parameters on power grid, voltage, reactive power of the system at all voltage levels, with typical products: (1)  SAVR – Automatic System of Voltage and Reactive Power Control; (2) ARN – Automatic Voltage Controller; (3) SRU – Group Voltage Controller; (4) Dynamic models of Transients in Power networks; (5) Verification model for sensitivity analyses .

NPT-EGU_310517_3.JPG
Ms. Luong Lan Dung – Director of International Relations Department made a speech at the workshop

The advantage of applying SAVR solution is to take full use of existing means such as control system, transmission routes, transformers  as parts of adjustment. According to estimation, technical loss will be reduced about 3-5% with the installed SAVR.

It is indicated by the workshop that both sides have received useful information, which can be basis for opening up a future cooperation./.​

Operations

Operations

Investment

Investment

International relations

International relations

Event Calendar

Event Calendar