Important achievements of EVNNPT

The national power transmission system reaches all the provinces and cities, and is linked with the grids systems of such countries as China, Lao PDR, and Cambodia thanks to modern technologies.

The 500 kV lines system plays the “backbone” of the national electricity system.

The 220 kV lines system becomes the “backbone” of the regional and provincial power system nation-wide.

EVNNPT is operating 28.612 km of both 500 kV and 220 kV lines.

EVNNPT is operating 176 substations at 500 kV and 220 kV, with a total capacity of 115.650 MVA.

Milestone

  • 21/12/1954

    Traditional Day of the Electricity Industry (the day
    Uncle Ho visited the Bo Ho Bulb Production Factory)

  • 01/07/2008

    Establishment of the National Power Transmission Corporation

  • 27/05/1994

    Operated the North South 500 kV lines (the national power transmission system is
    fully inter-connected)

  • 15/09/1976

    Establishment of the Power Transmission Company No. 4

  • 01/05/1981

    Establishment of the Power Transmission Company No. 1

  • 01/11/1981

    Establishment of the Northern Power Projects Management Board

  • 07/07/1988

    Establishment of the Central Power Projects Management Board

  • 01/04/1990

    Establishment of the Power Transmission Company No. 3

  • 01/05/1990

    Establishment of the Power Transmission Company No. 2

  • 01/08/1995

    Establishment of the Southern Power Projects Management Board

  • 01/06/2017

    Establishment of the Power Transmission Service Company

  • 01/06/2020

    Establishment of the Power Transmission Projects Management Board