Energizing the 2nd 220kV-250MVA transformer at Bac Ninh 3 220 kV substation

Thứ ba, 16/1/2018 | 09:40 GMT+7
​​At 04h40, on January 12th 2018, at Cho town, Yen Phong district, Bac Ninh province, the Northern Power Projects Management Board (NPMB) combined with the relevant units to energize the 2nd 220/110/22kV-250MVA transformer (AT2) at Bac Ninh 220 kV substation, completing the project "Installation of 2nd 220kV transformer at Bac Ninh 3 220kV substation". 

220-250-BN3_140118jpg.jpg
​The AT2 220kV-250MVA transformer befo​re energization

The energized 2nd 220kV-250MVA AT2 transformer at Bac Ninh 3 220 kV substation will contribute to ensure a secure and stable power supply to the loads of Bac Ninh city, especially Yen Phong industrial zone and Sam Sung electronic consortium, contributing to pushing up the socio-economic development of the area.

This is the energy project of Level 1, Group C, with a total cost of over VND 72 billion invested by the National Power Transmission Corporation (EVNNPT); NPMB was on behalf of EVNNPT to coordinate the management of project; Power Engineering Consultation Company 2 (PECC 2) was responsibile for project design; Song Da Joint Stock Installation and Services Company was responsible for implementation; Power Transmission Company 1 (PTC1) takes over the operation of project.

Scope of project: a new installation of a 220/110/22 kV AT2 transformer of a 250 MVA capacity (to increase the total capacity of Bac Ninh 3 220kV substation to 2x250 MVA); installation of a 220 kV feeder, a 110 kV feeder, devices to the 22kV side of the newly installed transformer./.